3C firefighting product certification process includes: certification commission, factory inspections, type testing, issuing certificates and post-certification supervision.
1. Certification commission 1.1 Proposal and acceptance of certification commission The certification client submits the certification of the products covered by this Implementation Rules to the Assessment Center through the “Fire-fighting Products Online Certification Business System†(.net.cn, .com.cn). When submitting a certification commission, you must provide the necessary company information and product information, including the business registration certificate, organization code, and agreements with related parties. The assessment center carries out an audit of the certification entrustment data, and if it meets the requirements, it will issue a notice of acceptance and signing the certification contract within 5 working days.
For those who do not meet the requirements, notify the certification client to correct the data and submit it within 5 working days.
Keyword: 3C Fire Pump 3C Certification 2. Corporate Quality Assurance Ability Check and Product Consistency Check (Factory Inspection)
2.1 Inspection basis According to the "General Requirements for Factory Inspection of Fire-fighting Products" (GA1035) and "Compliance Requirements for Inspection of Fire-fighting Products" (GA1061), the implementation is stipulated (see Appendix 5 for related requirements).
2.2 Inspection Contents Inspection content mainly includes document review, on-site inspection and follow-up activities. When the manufacture of certified products involves multiple sites, the site boundaries for site inspections shall include at least the site where the routine inspection, product nameplate and CCC mark are added, and further inspection shall be conducted at other sites (such as key processes).
2.3. Document Review Before the on-site inspection, the inspection team leader shall review the conformity and completeness of the documents and data according to the requirements of the inspection guidelines, and make conclusions on the document review. Document review should be completed within 7 working days. The contents of the document review include: (1) the factory information and product information provided by the certification client; (2) the basic conditions of the factory quality management system; (3) the basic situation of the factory organization and the distribution of functions; (4) certification of the product Characteristics and production process; (5) Designated inspection agency issued product inspection report and confirmed product property documents; inspection of the document, the inspection team leader shall immediately submit the document review conclusion through the “fire protection products online certification business systemâ€; If the review does not pass, a document review report shall be formed within 2 working days and reported through the “Firefighting Products Online Certification Business Systemâ€. If the document review finds that the certification materials do not meet the factory inspection criteria, no on-site inspections and follow-up activities shall be conducted.
2.4 On-site inspections and follow-up activities The implementation of on-site inspections is generally divided into five working phases: first meeting, collection and verification information, inspection findings and communication, confirmation of inspection conclusions, and final meeting. The main contents include: the first meeting, product consistency check, inspection of production equipment and inspection equipment, inspection of factory quality assurance ability, on-site witnessing of staff capabilities, communication, final meeting, sampling of products that have passed the routine inspection (factory inspection results For the adoption of recommendations) etc. The on-site inspection conclusions are divided into recommendations passed and not recommended: (1) When no unqualified or found unqualified is generally unqualified, the inspection conclusion is recommended; the factory shall complete the corrective measures within 30 days and send it to the inspection team leader. Submit corrective action report. (2) When the unqualified product is found to be severely unqualified, the inspection result is not recommended; if the inspection result is not recommended, the product certification shall be terminated. After the inspection team leader completes the on-site inspection, he shall immediately report the on-site inspection conclusion through the “Firefighting Products Online Certification Business System†and submit the inspection report and related materials to the assessment center within 5 working days.
2.5 Non-conformity report issued When the non-conformity found in the inspection process has caused or may lead to the factory's quality assurance ability or product consistency does not meet the requirements, it shall issue a non-conformity report. The disqualified nature is divided into serious unqualified and generally unqualified. Any one of the following situations is a serious failure: (1) Violation of relevant laws and regulations of the country; (2) There are serious problems in the conformity, suitability, and validity of the factory's quality assurance ability; (3) In production, circulation, (4) Failure to take corrective measures within the specified time limit or corrective measures taken within the specified time limit is invalid; (5) The key resources of the examined party are missing; (6) National standards for certification use, Changes in the technical specifications or certification implementation rules, the certification client failed to handle the relevant change procedures as required; (7) The product failed the inspection by the state/industry supervision and did not complete the effective rectification; (8) The certification client did not use the certificate according to the rules, Signs or unimplemented certificates and logos management requirements; (9) Sales and installation of suspended certificate products during certificate suspension; (10) Obtaining certificates through improper investigation; (11) Violation of the production and sales flow registration system of fire products; (12) Violation of other regulations of the assessment center.
Type test
3.1 The type test contract requires type certification of the test commissioned by the designated laboratories should be signed with the certification type test contract, the type test contract includes all types of sample test requirements and quantity, testing standards, etc., and inform the certification client.
3.2 Sample Requirements Under normal circumstances, the certification client should ensure that samples taken from the factory inspection site are delivered to designated laboratories as required within 15 days. If the certification client fails to deliver the sample within the specified time due to special circumstances, the issuing certification center shall issue a certification decision on the type test, the quality assurance ability of the enterprise and the conclusion of product consistency check and relevant information/information. Those who meet the certification requirements shall be issued certificates; if they do not meet the certification requirements, the certification shall be terminated.
5.After certification, supervision A must be completed at least once within 30 months. B must be completed at least once within 18 months. C must be completed at least once within 12 months. D must be completed at least once within 12 months.
1. Certification commission 1.1 Proposal and acceptance of certification commission The certification client submits the certification of the products covered by this Implementation Rules to the Assessment Center through the “Fire-fighting Products Online Certification Business System†(.net.cn, .com.cn). When submitting a certification commission, you must provide the necessary company information and product information, including the business registration certificate, organization code, and agreements with related parties. The assessment center carries out an audit of the certification entrustment data, and if it meets the requirements, it will issue a notice of acceptance and signing the certification contract within 5 working days.
For those who do not meet the requirements, notify the certification client to correct the data and submit it within 5 working days.
Keyword: 3C Fire Pump 3C Certification 2. Corporate Quality Assurance Ability Check and Product Consistency Check (Factory Inspection)
2.1 Inspection basis According to the "General Requirements for Factory Inspection of Fire-fighting Products" (GA1035) and "Compliance Requirements for Inspection of Fire-fighting Products" (GA1061), the implementation is stipulated (see Appendix 5 for related requirements).
2.2 Inspection Contents Inspection content mainly includes document review, on-site inspection and follow-up activities. When the manufacture of certified products involves multiple sites, the site boundaries for site inspections shall include at least the site where the routine inspection, product nameplate and CCC mark are added, and further inspection shall be conducted at other sites (such as key processes).
2.3. Document Review Before the on-site inspection, the inspection team leader shall review the conformity and completeness of the documents and data according to the requirements of the inspection guidelines, and make conclusions on the document review. Document review should be completed within 7 working days. The contents of the document review include: (1) the factory information and product information provided by the certification client; (2) the basic conditions of the factory quality management system; (3) the basic situation of the factory organization and the distribution of functions; (4) certification of the product Characteristics and production process; (5) Designated inspection agency issued product inspection report and confirmed product property documents; inspection of the document, the inspection team leader shall immediately submit the document review conclusion through the “fire protection products online certification business systemâ€; If the review does not pass, a document review report shall be formed within 2 working days and reported through the “Firefighting Products Online Certification Business Systemâ€. If the document review finds that the certification materials do not meet the factory inspection criteria, no on-site inspections and follow-up activities shall be conducted.
2.4 On-site inspections and follow-up activities The implementation of on-site inspections is generally divided into five working phases: first meeting, collection and verification information, inspection findings and communication, confirmation of inspection conclusions, and final meeting. The main contents include: the first meeting, product consistency check, inspection of production equipment and inspection equipment, inspection of factory quality assurance ability, on-site witnessing of staff capabilities, communication, final meeting, sampling of products that have passed the routine inspection (factory inspection results For the adoption of recommendations) etc. The on-site inspection conclusions are divided into recommendations passed and not recommended: (1) When no unqualified or found unqualified is generally unqualified, the inspection conclusion is recommended; the factory shall complete the corrective measures within 30 days and send it to the inspection team leader. Submit corrective action report. (2) When the unqualified product is found to be severely unqualified, the inspection result is not recommended; if the inspection result is not recommended, the product certification shall be terminated. After the inspection team leader completes the on-site inspection, he shall immediately report the on-site inspection conclusion through the “Firefighting Products Online Certification Business System†and submit the inspection report and related materials to the assessment center within 5 working days.
2.5 Non-conformity report issued When the non-conformity found in the inspection process has caused or may lead to the factory's quality assurance ability or product consistency does not meet the requirements, it shall issue a non-conformity report. The disqualified nature is divided into serious unqualified and generally unqualified. Any one of the following situations is a serious failure: (1) Violation of relevant laws and regulations of the country; (2) There are serious problems in the conformity, suitability, and validity of the factory's quality assurance ability; (3) In production, circulation, (4) Failure to take corrective measures within the specified time limit or corrective measures taken within the specified time limit is invalid; (5) The key resources of the examined party are missing; (6) National standards for certification use, Changes in the technical specifications or certification implementation rules, the certification client failed to handle the relevant change procedures as required; (7) The product failed the inspection by the state/industry supervision and did not complete the effective rectification; (8) The certification client did not use the certificate according to the rules, Signs or unimplemented certificates and logos management requirements; (9) Sales and installation of suspended certificate products during certificate suspension; (10) Obtaining certificates through improper investigation; (11) Violation of the production and sales flow registration system of fire products; (12) Violation of other regulations of the assessment center.
Type test
3.1 The type test contract requires type certification of the test commissioned by the designated laboratories should be signed with the certification type test contract, the type test contract includes all types of sample test requirements and quantity, testing standards, etc., and inform the certification client.
3.2 Sample Requirements Under normal circumstances, the certification client should ensure that samples taken from the factory inspection site are delivered to designated laboratories as required within 15 days. If the certification client fails to deliver the sample within the specified time due to special circumstances, the issuing certification center shall issue a certification decision on the type test, the quality assurance ability of the enterprise and the conclusion of product consistency check and relevant information/information. Those who meet the certification requirements shall be issued certificates; if they do not meet the certification requirements, the certification shall be terminated.
5.After certification, supervision A must be completed at least once within 30 months. B must be completed at least once within 18 months. C must be completed at least once within 12 months. D must be completed at least once within 12 months.
Raymond mill, also known as raymond grinding mill, raymond roller mill and raymond grinder, is suitable for grinding non-flammable and non-explosive materials.The finished powder size can be adjusted between 30 and 425 mesh (0.613mm-0.044mm). We have 3 roller Raymond mill, 4 roller Raymond mill, 5 roller Raymond mill, etc. for choice.
Raymond Mill,Stone Roller Mill,Barite Raymond Mill,Quartz Raymond Mill
henan ascend machinery , https://www.ascendminingmachinery.com