Model NO.: REMO-GB01
Runner: Cold Runner
Design Software: PRO, Ug, CAD
Installation: Semi Fixed
Standard: as Requirement
Customized: Customized
Certificate: ISO9001
Machining: Machining
Design Day: 3 Days
Cavity: Single/Multi
Deliery: by Sea
Mould Material: 45#, 50#, P20, H13, 718, 2738, Nak80, S136, SKD61
Delivery Time: 15-60 Days
Polish: Mirrior Polish
Trademark: REMO
Specification: International
Origin: China
HS Code: 84807190
120L 240L Plastic garbage bin mould(waste bin mould,dustbin mould):1. High quality material
3. Hot Runner: DME/LKM/HASCO
4. Mould Life: 500, 000~1, 200, 000 Shot
As a professional plastic mould manufacturer in China, we specialize in designing and making injection moulds for various plastic products. Our mould quotation will be made in 1 day and sent to consumers for reference. Quantity of mould and delivery time will be guaranteed.
Plastic garbage bin mould could be designed and manufacured as soon as the contract signed.
Name | Description | ||||
Mould Material  | 45#, 50#, P20, H13, 718, 2738, NAk80, S136, SKd61 etc | ||||
Mould Base  | LKM, HASCO ect. | ||||
Cavity  | Single/multi | ||||
Runner  | Hot/cold | ||||
Mould Design | 3D/2D Drawing | ||||
Design Days  | 3 days | ||||
Design Software  | UG, PROE, CAD, CAE, CAM, CAXA ect | ||||
Plastic Material | PP, PC, PS, PE, PU, PVC, ABS, PMMA ect | ||||
Mo uld Life  | 300, 000-3, 000, 000 shots | ||||
Injection System | Pin-point-gate | ||||
Polish System | Mirror Polish | ||||
P ayment | 40% of Deposit by T/T, 60% of Balance by T/T | ||||
Delivery Time  | 15-60days | ||||
Specification  | Depends on customers' requirements |
FOR MORE DETAILS,PLEASE SEND US AN INQUIRY.
Cold Storage Panel,Pu Cold Storage Panel,Insulated Cold Storage Panel,Cold Storage Panel For Warehouse
Jiangsu Easy Snow International Trading Co.,Ltd , https://www.qbcoldroom.com