West Side Development Project of Government Complex and South Bookstore

Project Name: Henan Dacheng (Group) Real Estate Development Co., Ltd. Gulou District Government Complex and the Development and Reform Project on the West Side of Nanshu Branch Progression Phase: Filing Construction Period: October 2011 - October 2013 Major equipment: fire-fighting facilities, security facilities, Water supply and drainage facilities, electrical facilities, ventilation facilities, lighting facilities, and cranes.
Project Introduction:
The project is located in the Gulou District Government Complex, west of Nanshudian Street, Henan Dacheng (Group) Real Estate Development Co., Ltd. Gulou District Government Complex and the development of the west side of the South Bookstore project, the project commercial street covers an area of ​​about 27 acres, the total construction With an area of ​​approximately 35,861 square meters, all buildings are 2-storey, partially 3-storey antique buildings. The project will have a total investment of 270 million yuan. Upon completion, there will be a large number of brand stores, specialty stores, and chain stores, forming a comprehensive commercial pedestrian area integrating tourism, commerce, leisure, shopping, and snacks.

Total investment of the project: 270 million yuan.

Construction unit: Henan Dacheng (Group) Real Estate Development Co., Ltd. Postal address: No. 26, Sihou Street, Kaifeng City Postal code: 463000
Contact: Li Pengcheng Telephone

Related Developments: Tower Crane Infrastructure Project

Aluminum Alloy Anodized Tube

Aluminum Alloy Anodized Tube

1.Specification: Various size as customer's requirements
2.Material:A6063,A6061,A3003 and other series alu alloy
3.Suface treatment: anodizing ,polishing,turning ,power coating,mill finish etc
4.Design:OEM,ODM,or design by ourselves
5.Equipment: CNC ,extruding machine,cold drawn machine,heating oven,straigtening machine,cutting machine

OD

OD Tolerance

ID Tolerance

Roundness

straightness

Circular run-out

φ16-20

±0.02

±0.02

0.01↓

0.015↓

0.05↓

φ20-30

±0.02

±0.02

0.01↓

0.015↓

0.05↓

φ30-50

±0.05

±0.05

0.02↓

0.020↓

0.08↓

φ50-80

±0.15

±0.10

0.05↓

0.025↓

0.10↓


6. STANDARD PACKING :Wooden case/carton

7. OPTIONAL PACKING: Polyfoam interleave inside, wooden case

Anodized tube workshop

Trade Terms
1. Payment: 30% T/T in advance, 70% balance pay before delivery. L/C at sight.
2. Delivery time: 20 days after deposit receiverd. If opening mould, plus 7-10 days.
3. Trade Term can be chosen depending on your requirements.
4. FOB Port: Shanghai


Aluminum Alloy Anodized Tube,Aluminum Anodized Tube,Aluminium Anodized Tube,Aluminum Anodized Pipe

Changzhou YiFei Machinery Co., Ltd. , https://www.yifeialu.com