Stabilized soil mixing plant mixing station screw conveyor should pay attention to safety, and second, stable soil mixing station screw conveyor before the cement tank must be cement emptying. Zui is a good way to mix the finished product to the cement warehouse empty.
Parts needed to replace the screw: 2 pull-hoists, welding machine, oxygen cutting, crowbar, hammer, wrench, lifting tools, artificial, screws, wire rope, screw conveyor, wire rope buckle, etc.
Stabilized soil mixing station replace screw conveyor in correct order:
1, cement warehouse emptying
2, pull the hoist fixed, hoisting equipment ready to place, will be firmly fixed screw
3, cutting cement or cutting cement warehouse screws.
4, put down the old spiral cut down.
5, welded cement warehouse under the material outlet. Get ready to install the tool and lift the new spiral.
6. Pull the hoist and pull it up. After the seat is in place, fix the screw on the screw conveyor of the Stabilization Mixing Station tightly, and then apply sealant or glass glue on the gap.