In recent years, the Dongxin District Agricultural Commission has paid more and more attention to the construction of the grain drying system and created a grain drying service center in the entire area.
The Agriculture Department of the New District Agriculture Department and the District Agricultural Machinery Technology Promotion Station combined the land area and budget of each town, completed the design of the construction, and proceeded to promote the construction of the second batch of grain drying stations. It plans to build 11 grain drying centers, including 12 tons of And a total of 32 sets of 30-ton units with a total installed capacity of 384 tons.
In order to optimize the layout of the drying system, and further improve and enrich the installed capacity of the first batch of drying points, after consultation, it was decided to build 3 new drying points in the towns of Nicheng, Laogang and Huinan, and it is expected to increase the drying capacity by more than 200 tons. Ton.
It can be expected that with the joint efforts of the new district and town governments and the agricultural sector, the food drying system in Pudong will be basically completed before September 2016, which will greatly increase the grain drying capacity of the Pudong New Area and be carried out in the “Three Autumnsâ€. Grain drying service escorts food production.
For Turbo System,Turbocharged Engine,Twin Scroll Turbocharger,Turbo Charging
Zhejiang Xuzhong Auto Parts Co., Ltd. , https://www.cnxuzhong.com