Premium Custom Plastic Refrigerator Fridge Crisper Drawer Mould

Model NO.: JSL-T1785-3
Runner: Hot Runner/ Cold Runner
Design Software: Ug,PRO-E,Solidwork
Installation: Fixed
Certification: ISO
Standard: Dme/Lkm/Hasco Ect
Customized: Customized
Mould Base: S50c/C45
Mould Standard: Professional QC in House Machine
Machine Equipment: CNC,EDM,Wire Cutting Machine,Drilling/Grinding
Mould Cooling System: by Experienced Designer
Mould Quality Control: by Professional QC
Mould Operating Mode: Automatically by CNC
Heat Treatment: Nitriding, etc
Mould Design: 7days
Mould Report: 7-10days Per Time
T1 Time: 50days
Trademark: JSLMOULD
Transport Package: Wooden Crate
Specification: AS REQUIREMENT
Origin: Taizhou, China
HS Code: 8480719090
Mold name: Premium Custom Plastic Refrigerator Fridge Crisper Drawer mould

1. Offer mould core, cavity steel certificate
2. Offer mould trial video, good after-service


JSL Mould Quality Control
For the Q/C of mould, there are 3 steps:

1. Mould Material Q/C

- Mould Steel Checking(Hardness, flaw detection)

- Mould Standard Spare Parts Checking(hardness, size, flaw checking)

2. Mould Making Process Q/C

- design checking (part design, mould design, mould engineering drawing)

- checking each part of mould's size after machining, according to 2D drawing

- mould testing(check mould running condition)

3. Check with customer's requirement again before mould shipping.
For more information, please contact with us freely.


 
Product Name Premium Custom Plastic Refrigerator Fridge Crisper Drawer mould
Product material PC
Core&Cavity Steel 2738
Steel hardness  HRC35-38
Mould Standard DME
Cavity Number 1
Injection System direct gate(hot runner)
Ejector System ejector pin
Cycle Time 35''
Tooling lead time 60days
Mould life 500,000shots
Quality assurance ISO9001

 

Our Advantage
1.High quality
2.Reasonable price
3.On time delivery
4.Good After-sale service
5.Strict quality control
6.All the mould are automotic.

 

Offer you
In-time response on letters, telephone calls or fax
In-time supply the quotation and mould designs
In-time communication on the technical points
In-time sending pictures for the mould machining progress and mould finishing schedule
In-time mould test and sample delivery
In-time mould delivery.

 
 
Processing Time
Prepare Steel 5 days
CNC Machining 10 days
Drill 8 days
Heat treatment 6 days
High speed CNC Machining 7 days
Assembling and Fitting 6 days
Polishing 6 days
T1 mould test 2 days
1. Samples/Drawing & Requirement from you
2. Mould design: we will Communicate& Exchange the opinion with you after you place order.
3. Material Purchase: Steel cutting and Mould base tooling. 
4. Assembling.
5. Inspection of mould: following and controlling the tooling processing.
6. Mould testing: We will inform you the date. Than will send the sample' s inspection report& injection parameters with the sample to you!
7. Your instruction & confirmation for shipment.
8. Ready made mould before packing.

CNC Panels Bending Machine

Cnc Panels Bending Machine,Sheet Metal Panel Bender,Sheet Metal Panel Bending,Cnc Panel Bender

Wuxi Taohua Machinery Technology co.,Ltd , https://www.wedingrotator.com