Model NO.: TT-AE
Technique: Forged
Type: Tube Fittings
Head Code: Hexagon
Od Size: 1/16′′-1′′
Structure: Tee
Working Pressure: up to 9000psi
Medium: Water, Oil, Gas
Working Temperature: -20 to 200 Celsius Degree
Power: Hydraulic
Trademark: YC-LOK
Transport Package: Wooden Box
Specification: 38*27*17cm
Origin: Jiangsu, China (Mainland)
HS Code: 7307290000
Model NO.: TT-AE
Technique: Forged
Type: Tube Fittings
Head Code: Hexagon
Od Size: 1/16′′-1′′
Structure: Tee
Working Pressure: up to 9000psi
Medium: Water, Oil, Gas
Working Temperature: -20 to 200 Celsius Degree
Power: Hydraulic
Trademark: YC-LOK
Transport Package: Wooden Box
Specification: 38*27*17cm
Origin: Jiangsu, China (Mainland)
HS Code: 7307290000
1.Product Name:
Elbow Tee Reducer Pipe Fitting Tube Fitting
2.Description:
Material: Stainless SteelTechnique: Forged
Type: Tube Fittings
Place of Origin: Jiangsu, China (Mainland)
Brand Name:Â YC-LOKÂ
Connection: Thread
Shape: Equal
Head Code: Hexagon
OD Size: 1/16''-1'' ,3mm-25mm
Structure:Â union,elbow,tee,cross,bulkhead,male or female connector
Working Pressure: up to 9000psi
Medium: water, oil, gas, acid ,base and so on
Special Treatment: ferrule hardness treatment
Nut Treatment: silver planted
Tube Treatment: fully annealed
Inner Cone: mirror polishing processing
Working Temperature: -20 to 200 Celsius degree
Power: hydraulic
Â
3. Packaging & Delivery
1.Packaging Details: | 1. Wooden box 2. Carton 3. As your request. |
2.Delivery Detail: | Shipped in 30Â days after payment |
3.Logo: | Any logo is available |
4.MOQ: | 100 pcs |
5.Samples: | Â Free |
6.OEM Accepted | Â Yes |
7.Production Capacity: | 10,000pcs Per week |
8.Payment Term: | (1) L/C,T/T,D/P,D/A,PAYPAL,WESTERN UNION,MONEY GRAM |
FAQ:
Q1.Can IÂ get free samples?
A: Yes,we can provide you the free sample, but you need to bear their own delivery costs.
Â
Q2. Can I have a sample order for fittings?
A: Yes, we welcome sample order to test and check quality. Mixed samples are acceptable.
Q3. Are you a trading company or a manufacturer?
 A: We are a manufacturer.
Q4. What is your payment term?
 A:Normally T/T 50% in advance, balance to be paid before delivery.
 Q5: What is your main market?
 A:North America,Greenland,South America,Africa,Southeast Asia, Former Soviet Republics ,East Asia,and Europe.
 Q6:What kind of trade terms can you do?
A:EX-WORKS,FOB,CFR,CIF,etc.
Q7. What about the lead time?
A:Sample needs 15 days, mass production time needs 35 days.
Â
1.Product Name:
Elbow Tee Reducer Pipe Fitting Tube Fitting
2.Description:
Material: Stainless SteelTechnique: Forged
Type: Tube Fittings
Place of Origin: Jiangsu, China (Mainland)
Brand Name:Â YC-LOKÂ
Connection: Thread
Shape: Equal
Head Code: Hexagon
OD Size: 1/16''-1'' ,3mm-25mm
Structure:Â union,elbow,tee,cross,bulkhead,male or female connector
Working Pressure: up to 9000psi
Medium: water, oil, gas, acid ,base and so on
Special Treatment: ferrule hardness treatment
Nut Treatment: silver planted
Tube Treatment: fully annealed
Inner Cone: mirror polishing processing
Working Temperature: -20 to 200 Celsius degree
Power: hydraulic
Â
3. Packaging & Delivery
1.Packaging Details: | 1. Wooden box 2. Carton 3. As your request. |
2.Delivery Detail: | Shipped in 30Â days after payment |
3.Logo: | Any logo is available |
4.MOQ: | 100 pcs |
5.Samples: | Â Free |
6.OEM Accepted | Â Yes |
7.Production Capacity: | 10,000pcs Per week |
8.Payment Term: | (1) L/C,T/T,D/P,D/A,PAYPAL,WESTERN UNION,MONEY GRAM |
FAQ:
Q1.Can IÂ get free samples?
A: Yes,we can provide you the free sample, but you need to bear their own delivery costs.
Â
Q2. Can I have a sample order for fittings?
A: Yes, we welcome sample order to test and check quality. Mixed samples are acceptable.
Q3. Are you a trading company or a manufacturer?
 A: We are a manufacturer.
Q4. What is your payment term?
 A:Normally T/T 50% in advance, balance to be paid before delivery.
 Q5: What is your main market?
 A:North America,Greenland,South America,Africa,Southeast Asia, Former Soviet Republics ,East Asia,and Europe.
 Q6:What kind of trade terms can you do?
A:EX-WORKS,FOB,CFR,CIF,etc.
Q7. What about the lead time?
A:Sample needs 15 days, mass production time needs 35 days.
Â
Electric Water Pump,Electrical Water Pump,Electronic Water Pump,High Pressure Electric Water Pump
Fuxin Dare Automotive Parts Co., Ltd. (DARE AUTO) , https://www.darepump.com