Since the beginning of this year, Dongfeng Cummins Engine Co., Ltd. has implemented the lean production management philosophy throughout the company and has determined the focus of the work of the seven standard operations. In recent days, all seven projects have been closed by time, and the lean production of Dongfeng Cummins has been stepped up. A new level.
The seven standard operations include the pre-installation and demolition projects in the Eastern District production platform, the C-series natural gas engine gas system total component installation project, the C cylinder block cover assembly project, and the B-series low-cost electronically controlled engine bottleneck assembly process (Z620 and Z630) projects, etc. It is reported that after the closure of these seven standard operating projects, post-validation and training of operators will also be carried out. In the next phase, standard work will be carried out to promote large-scale training, which is expected to be completed by the end of this year.
Stainless Steel Sheet,Stainless Steel Coil,Stainless Steel Tube,Stainless Steel Pipe,Stainless Steel
Shandong Rizhaoxin Metal Products Co., Ltd. , https://www.cysteelcoil.com